A mobile crushing plant maintenance:
1, the bearing shoulder the entire load of the machine, so good lubrication of the bearing life great relationship, it directly affects the life of the machine and the operating rate, thus requiring lubrication of the injection
The oil must be clean, seal must be good, the machine main oiling Office (1) rotating bearing (2) roller bearings (3) All gear (4) activities bearing, sliding plane. 2, Xin'an
Loaded rim prone to loosening must be checked frequently. 3, pay attention to each part of the machine is working properly. 4, pay attention to check the degree of wear of the wear parts, pay attention to more
In other wear parts. 5, put the active device chassis plane should be out of the dust and other objects to avoid machine activities encounter material that can not be broken bearing can not be moving to the chassis, so as to cause the strict
Heavy accident. 6, bearing oil temperature rise should immediately stop checking reason to eliminate them. 7, rotate the gear in operation if it has impact sound should immediately stop checks and elimin
B mobile crushing plant installation commissioning:
1, the device should be installed on a level concrete foundation with anchor bolts. 2, the installation should pay attention to vertical main body level. 3, check each part installed bolts
For loose fastening host Kurakado whether, if any fastening. 4, the power cord and control switch device power configuration. Checked, empty load test, test